Clear scope
Operating and Maintenance teams
Multi-professional operating and maintenance teams help Makkah facilities to raise preparation, continuation of service and minimize the impact of disruption and sudden need.
- Buildings and Facilities
- The warehouses
- Commercial Facilities
- Sites with work shifts Operating
- Prevention and correction contracts
Multi-professional team
Need configuration includes electrical, welding, adjustment, maintenance and supported professions according to the location.
Cover of work shifts
Identify the days and hours of operation, delivery and receipt points for each work shifts.
Planned Activities
Connect numbers to the preventive business plan and expected periodic tasks.
Response to Change
Revise the gap when increasing reports, adding a building or changing operating hours.
Step: Assets and Locations Limitation
Description of the facility and areas that the team will cover and the scope of responsibility.
Step: Design of work shifts
Identify the professions and numbers required in each operation period.
Step: Establishment of requirements
Registering periodic tasks, safety, entry and documents requirements.
Step: Continuous follow-up
Monitor team preparation and coverage with the representative of the establishment and respond to variables.
Before contacting us
Information for a more accurate review
The more specific the demand range, the less assumptions and the supply became clearer.
- Type of facility and number of locations or buildings
- Operating hours and work shift system
- Technical professions and numbers
- List of preventive actions and expected reports
- Entry, Safety and Response Requirements
Frequently asked questions
Answers related to this page
Can you build a maintenance team with more than a profession?
Yes, an independent number of each occupation within the same range is determined according to the size of the facility, operating hours and expected work.
How does work shifts affect the estimate of need?
Coverage for each work shifts, rest days and delivery between periods should be calculated, so operating hours are the most important order data.
Does the application include preventive and correction activities?
The two types can be described in the need range, with the expected tasks, liability limits and the level of coverage required prior to set up the offer.
Request a quotation